How a Groenevolt job runs

From the first message to the system running on your phone, every job follows the same six stages. Here is what happens at each one, and what you get from it.

Solar technician with a tablet pointing at a roof with a homeowner

Six stages

Skip none of them, even on small jobs. Most problems we repair on other systems trace back to a skipped site visit or missing paperwork.

  1. 1

    Tell us what you need

    Send the quote form or call. A photo of your DB board and a recent electricity bill help us prepare.

  2. 2

    Site visit

    We check the roof, shading, DB board and where the inverter and battery can go, and list the loads you want covered.

  3. 3

    Design and quote

    A written quote with the system sizes, a roof layout, what is on backup and what is not, and the expected install days.

  4. 4

    Installation

    Mounting, panels, inverter, battery and protection, installed and labelled. We clean up as we go.

  5. 5

    Testing and sign-off

    Every circuit tested, battery limits set, Certificate of Compliance issued and SSEG paperwork prepared where required.

  6. 6

    Aftercare

    App set-up, a walk-through of the system, and reminders for cleaning and inspection when they are due.

What you have at the end

  • A written quote with model numbers and what is on backup
  • An electrical Certificate of Compliance
  • SSEG registration documents where your municipality requires them
  • Equipment warranty documents from the manufacturers
  • Monitoring app set up on your phone
  • A labelled DB board and a bypass switch for servicing

Tell us about the property

Send the basics and we reply to arrange a site visit or a quote. A photo of your DB board and a recent electricity bill help us prepare, and you can attach them to the email this form opens.

Property
What do you need?

Opens your email app with the message filled in. We only use your details to reply. Privacy